Dave's Scimitar SS1 1600

The re-commissioning

Page 3 of 9

See Page 1 | 2 | 3 | 4 | 5 | 6 | 7 |8 | 9

August 2011 >
Welding finished.

Thanks Karl!!

enginebay_06.JPG (197717 bytes) enginebay_07.JPG (217353 bytes) Next job was to scrape off the oil and crud from the chassis front  while the engine was still out. > enginebay_08.JPG (217960 bytes)
enginebay_09.JPG (224043 bytes) Then give the chassis front a quick paint to tidy up and help preserve it. > enginebay_10.JPG (208072 bytes) enginebay_11.JPG (230237 bytes) Next job was to remove the knackered gearbox. > engine_04.JPG (253710 bytes)
engine_06.JPG (231502 bytes) Next the engine was degreased > engine_05.JPG (261126 bytes) engine_07.JPG (265673 bytes) then given a coat of black paint > engine_08.JPG (236838 bytes)
Fitted new thermostat, cleaned and checked clutch  and fitted replacement gearbox. > engine_09.JPG (259216 bytes) New timing belt fitted while engine was out > engine_10.JPG (270631 bytes) Rocker cover is sanded down ready to paint > rockercover_01.JPG (203042 bytes)
rockercover_02.JPG (153443 bytes) September 2011 > Engine is back in and sporting a shiny red rocker cover and newly made stainless steel water pipes > engine_11_rocker.JPG (228438 bytes) All put back together and engine running again and I now have gears!! > engine_11_ss_pipes.JPG (225147 bytes)
Now the car is back together with all its bit intact, my landlord agrees that I can now bring my SS1 to my new home so I can continue working on it, so my faithful GTE comes in useful > home_01.JPG (327045 bytes) home_02.JPG (352576 bytes) October 2011 > First job is to replace that blue door >
door_01.JPG (212437 bytes) door_02.JPG (319484 bytes) The electric motor worked well on the blue door, so this was all stripped ready to put into the gold door > door_03.JPG (354259 bytes) Gold door frame wasn't too good > door_04.JPG (423737 bytes)
door_05.JPG (241596 bytes) The blue door frame was slightly better > door_08.JPG (320780 bytes) door_06.JPG (427045 bytes) So i decided to strip and clean that one > door_07.JPG (211615 bytes)
door_09.JPG (340890 bytes) The frame was completely stripped and rust proofed > door_11.JPG (226381 bytes) new studs were fitted to the bottom of the quarterlight > door_10_studs.JPG (194031 bytes)
door_12.JPG (261700 bytes) door_13.JPG (210408 bytes) door_14.JPG (134407 bytes) The frame parts were then given a coat of paint > door_15.JPG (175501 bytes) door_16.JPG (271008 bytes)
See Page 1 | 2 | 3 | 4 | 5 | 6 | 7 |8 | 9